Experience is irreplaceable,
particularly when it comes to managing
construction projects

What We Do

LeClair Construction Management is a full-service Construction and Project Management firm offering professional services to select construction and development projects for over thirty years.

Services Include:

  • Land assessment and change of use.
  • Site Development and servicing.
  • Due diligence and assessment of existing structures.
  • In-house schematic and program design services.
  • Multi-iterative cost consulting, Professional Quantity Surveyor.
  • Consultant team procurement and document review.
  • Construction methodology and scheduling.
  • Tender and contract document preparation and administration.
  • Fully transparent and auditable trade tenders and reporting.
  • Construction site management with quality control and assurance procedures and documentation.
  • Construction cost control with real time budget forecasting and reporting.
  • Project close-out, commissioning, operator training, and handover procedures.
  • Third party claims preparation, representation, and dispute resolution.
  • Third party incident review and consulting.

ACTIVE PROJECTS

Rosseau Lake College-Recreation Centre

Construction Start: September 2023
Substantial Completion: December 2024

Rosseau Lake College-STEAM

Preconstruction Start: February 2023

gallery

Cathedral Hills
Parliament Hill, Ottawa

Wellington West
Parkdale, Ottawa

The Miller
Manotick

Simpson Tower
Toronto

Cactus Club-First Canadian Place
Toronto

Marsh McLennan
Toronto

Cactus Club
Edmonton

Yaletown Keg
Vancouver

Partial project lIST

  • Rosseau Lake College, Muskoka- Master Service Agreement managing Campus Master Plan and redevelopment.
  • “Orchard View Manotick” for Reichmann International- Construction Manager. 95,000sf, 3 story wood frame construction with one sub-grade parking level, 45-unit seniors’ apartments with full commercial kitchen and public café.
  • “Wellington West”, Ottawa for Reichmann International- Construction Manager. 93,000sf, 9 story concrete construction with two sub-grade parking levels, 111 units, pool, lounge, gym, program areas, commercial kitchen, and podium level terrace.
  • “Cathedral Hill” Ottawa for Reichmann International- Construction/Project Manager. 180,000sf, 18 story concrete construction with three sub-grade parking levels, 160 units, pool, bar, cafe, gym, program areas, 18th floor dining room and commercial kitchen located on Parliament Hill.
  • SAP Canada Head Office, 222 Bay St. Toronto- 60,000sf, three floor office fit-up with new feature stair.
  • Walmart Canadian Store Support Centre, Mississauga- 180,000sf, retrofit and re-stack. Multi-phased, including new washrooms, cafeteria/kitchen retrofit and mechanical upgrades.
  • Desjardins General Insurance Group, Mississauga- 220,000sf, interior fit-up and restack. Multi-phased.
  • Mosaic Sales Solutions, Carpet Factory, Liberty Village, Toronto- 18,000sf, interior fit-up for this media/technology firm. Post and beam historical building.
  • Wildeboer Law, 365 Bay St, Toronto- 18,000sf, three floor fit-up with feature client facing areas.
  • Newell Brands, Brampton- 40,000sf, product showroom and administration office fit-up.
  • Scotiabank ECO 3 and 6, 4 King Street W, Toronto- 80,000sf, 6 floor tenant fit-up with two interconnecting feature stairs.
  • Simpson Tower Re-Clad, 401 Bay St, Toronto- 33 story, building envelope replacement while existing tenants maintained occupancy. Extreme urban site access restrictions. 10,000 engineered staging platform constructed on roof of neighboring Hudson’s Bay Store.
  • US Consulate, Toronto- 12,000sf, physical and electronic security upgrades in a classified high security environment including, sally port, holding cells and FE/BR doors and wall assembly installations.
  • Equinox Fitness, Toronto- 2 and 3rd floor Commerce Court W. 37,000sf luxury fitness facility.
  • TD Treasury Optimization, TD Tower, Toronto- 25,000sf, LEED Platinum tenant fit-up/back to base.
  • Cactus Club Restaurant, Jasper Ave Edmonton Alberta- 9,000sf restaurant.
  • Cactus Club Restaurant, First Canadian Place- 23,000sf flagship three level restaurant, including podium rooftop lounge, glass elevator, feature stair, with extensive structural and mechanical base-building upgrades.
  • Marsh & McLennon- 10 story, 250,000sf tenant fit-up in the new South core tower at 120 Bremner. Restoration of existing spaces.
  • Holt Renfrew, Square One- 160,000sf new ground up retail store.
  • “Simon’s” Square One- 106,000sf new retail store.
  • “Bensimon Byrne”, Toronto- 45,000sf advertising agency interior fit-up, CBC building.
  • “Eataly”, Manulife Centre, Toronto- Precon Project Director. 45,000sf Indoor market/restaurant complex, Manulife Centre.
  • “Loyalty One”, Toronto- Precon Project Director, 6 story, 200,000sf ARIDO award winning tenant fit-up in the new Globe and Mail Building 351 King St. W.
  • 333 Queen St. W, Toronto- 23,000sf, base building construction. Demolition of 4 existing buildings, shoring adjacent buildings/roadways, site servicing, excavation, raft slab, structural steel, core-slab and masonry construction on an extremely tight urban site.
  • H&M Square 1, Mississauga- 14,000s retail store, phased/occupied work.
  • M:BRGR 409 King St. W, Toronto- 6,000sf, restaurant interior fit-up.
  • The Keg Yaletown, Vancouver- 20,000sf, 4 story flagship restaurant, with rooftop patio.
  • H&M Pacific Centre, Vancouver- 33,000sf, West Coast flagship retail store.
  • H&M Louhgeed Mall, Burnaby- 12,000sf, retail store.
  • H&M Conestoga Mall, Waterloo- 14,000sf, retail store.
  • Spence Diamonds Square One, Mississauga- 8,000sf, ground-up retail store.
  • Esprit Metropolis, Burnaby- 5,000sf, retail store.
  • Esprit Fairview Mall, Toronto- 3,000sf, retail store.
  • Coquitlam Centre Mall, Coquitlam- 180,000sf, escalator installation, mall common space tile installation and electrical/data under-floor duct bank installation.
  • LCBO, The Beer Store, Canadian Tire Corporation, TD Bank, Scotiabank, CIBC, Toys R Us, SmartCentres- Multiple ground-up and interior fit-ups throughout Ontario for each retail entity.
  • RBJ Schlegel, Kitchener – Kitchen Facilities for this 600 Resident Retirement Complex.
  • Profine Molds, Oakville- 50,000sf design-build manufacturing facility.
  • ScotiaBank Corporate Premises, Toronto- Anti-terrorist budgeting and assessment and measures for Scotia Plaza post 9/11.
  • ScotiaBank Corporate Premises, Toronto- Security upgrades to Scotia Plaza cash handling area.
  • Toronto Maple Leafs Practice Facility, Toronto- 40,000sf training and player rehab facility.
  • Queen Richmond Center East, Toronto- 280,000sf “Robertson Chocolate” historical building complex restoration and base building retrofit.
  • Guelph Police Headquarters, Guelph- 15,000sf reception, change/shower facilities upgrade, and prisoner intake sally port.
  • Crescent School Sports Complex, Toronto- 35,000sf Fieldhouse and sports complex with change/shower facilities, weight room, indoor running track and four tennis courts.
  • Dalton Chemical, Vaughan- 5,000sf pharmaceutical manufacturing Level 1 clean rooms.
  • Maplehurst Correctional Complex, Milton- Design-build maximum security correctional facility.
  • Manulife Financial- South Tower Retrofit, Toronto- 12 story, 240,000sf base building retrofit and historical restoration followed by full “tenant” fit-up work.
  • Manulife Financial- Dawson Manor Estate, Newmarket- Relocation of historical building, site preparation and servicing.

OUR TEAM​

Darren LeClair

Construction and Project Management

darren@leclairconstructionmanagement.ca

Erika Connor

Design and Project Coordination

erika@leclairconstructionmanagement.ca

Contact Us

Email

darren@leclairconstructionmanagement.ca


erika@leclairconstructionmanagement.ca